Block SK 309/311 - Pemanis, Serendah, Patricia, Wangsa, Tiram, Belum and Sapih - Sarawak
2017-12-21 15:00  点击:8
VIP:1级

Project Profile


Value: US$100 million
Location: 25 miles southwest of the Opal Hub in Uinta County, Wyoming
Production: 12,000 barrels per day of oil and 83 MMcfd of gas
Start-up Year: 2013

Serendah will be developed using an integrated oil and gas production and accommodation platform to be tied back to a pipeline linking the Merapuh platform to the Golok riser platform. The Serendah platform is expected to process 12,000 barrels per day of oil and 83 MMcfd of gas. Serendah is a marginal oil and gas field about 16.5 kilometres northeast of the Golok gas platform. Production at Serendah was targeted to start up in the fourth quarter of 2013.

Operator:

Murphy Sarawak Oil Co. Ltd.: Operator with 85% interest

Petronas: 15% interest

Contractors:

Aker Solutions: Supply 24 sets of splitter wellhead systems

Brooke Dockyard and Engineering Works Corporation

Boustead Penang Shipyard: Provide engineering, procurement, construction and commissioning of Belum Topsides

Hercules Offshore: Drilling development well

Kencana: EPC for Serampang-A (SEPA) Production of Topside Facilities for Phase 1 SK-309/311

Tanjung Offshore Services

TH Heavy Engineering Bhd: EPCC contract