Project Profile
Value: $500 Million
Contract Type: Feasibility Study
Project Status: Government/Authority Approved
Startup Year: 2015
Upstream Gas Reserves: 2,000 billion ft³
The project will see the development of the Walanga, Sampi Sampi, Bonge (WASAMBO) fields in the Sengkang PSC block in South Sulawesi. The development facilities include: Drilling of six development wells consisting of three in the Walanga Field, two in the Sampi Sampi Field and one in the Bonge Field; Central Processing Plant (CPP) and the metering station; Gathering Station development in every field (Walanga, Sampi Sampi and-Bonge); Installation of gathering trunk line that connects the station with the CPP; Installation of flow lines from six wells to the Gathering Station in every field; Installation of Gas Export Pipeline along the 19 km from the CPP to the Fiscal Metering Station.
The Sengkang PSC is estimated to have reserves of between 2 trillion and 4 trillion cubic feet (TCF) of recoverable gas.
Operator:
Energy World Corporation (EWC)