Oil&Gas
Kumang Cluster Development Project - Block SK306
2017-12-21 15:00  点击:11
VIP:1级

Project Profile




Value: US$100 million
Location: Offshore Sarawak
Start-up Year: 2011

Located at offshore Sarawak, the Kumang Cluster field development will consist of two phases. Phase one consists of F9, Kumang and Kanowit fields and Phase two consists of A3, F11, F22, F27, F12, Selar Marine and Bunga Pelaga fields.

Operator:

Petronas Carigali Sdn Bhd: Operator with 100% interest

Contractors:

Aker Process Systems Asia Pacific: Subsea umbilicals

Brooke Dockyard & Engineering: EPC - Fabrication and load-out of F9 wellhead jacket

Daewoo Shipbuilding and Marine Engineering: Building vessel at yard in Okpo

DNV: Class PETRONAS’ first floating LNG unit (PFLNG 1)

Kencana HL: Offshore hook-up and commissioning for Kanowit CPP Platform

MMC Corporation Berhad: Conceptual design

Ramunia Fabricator: EPC - Fabrication of KUJT-A jacket and Kanowit central processing platform jacket

Sime Darby Berhad: EPC - Topsides for two wellhead platforms, F9JT and KUJT-A and Kumang CPP

Subsea 7: Installation of subsea structures

STATS Group: Pipeline isolation operations at Kumang Cluster onshore tie-in project

Tanjung Offshore Services Sdn Bhd: EPC - Provision of a glycol dehydration system

TL Offshore: EPC - Installation contract
联系方式