Oil&Gas
Ca Ngu Vang (Golden Tuna) and Te Giac Trang (White Rhinoceros) Oil Fields
2018-08-07 21:15  点击:4
VIP:1级

Project Profile


Value: US$250 million
Location: Vietnam\'s Cuu Long Basin, Vietnam
Reserves: 818 million barrels of oil
Start-up Year: 2011

The project will see a development concept comprising of three shallow water platforms, connected by an interfield pipeline. The production will be via a leased FPSO. The Ca Ngu Vang field main facilities include a multi-phase flowline and water injection line, each around 17km to 21km long and 10-in to 12-in in diameter, a minimal facility wellhead platform weighing around 1,200 tonnes including a 600-tonne deck and equal weight four-legged jacket. The Ca Ngu Vang field has mean recoverable reserves of 155m bbl and Block 9-2 has exploration potential of 250m bbl. However, an independent reservoir evaluation updated the TGT Stock Tank Oil Initially In Place (STOIIP) demonstrates a most likely volume of 818 million barrels of oil (mmbo) for the currently drilled fault blocks. Including the H5N and H5S fault blocks, planned to be drilled in Q1 2015, the most likely STOIIP would be 949 mmbo.


Te Giac Trang includes two wellhead platforms and pipelines. The first WHP will have a 1100-tonne jacket and a 410-tonne drilling deck. Two modules weighing about 1400 tonnes and 500 tonnes respectively will also be installed on the platform. The second WHP has a 1100-tonne jacket and a 410-tonne drilling deck. There will be six pipelines running from the first WHP to PLEM, as well as three pipelines connecting the two WHPs. The six pipelines comprise five lines each 1.8 km long with a 10-in diameter, and one 8-in, 1.8km line. The other three pipelines comprise one 6-in 8 km line, one 8-in 8 km line and one pipe-in-pipe line, which consists of a 20-in outer pipe and a 16-in carrier pipe. The converted FPSO is expected to be capable of processing 45,000 bpd and storing up to one million barrels of oil.


Operators:

Hoang Long Joint Operating Company: Constituent companies:

PetroVietnam: 41% interest

PTT Exploration and Production (PTTEP): 28.5% interest

Soco International: 30.5% interest


Contractors:

Bumi Armada: FPSO contract

Clough Limited: Transportation, installation and commissioning of two 26km subsea pipelines

EDG Inc.: FEED contract

Engineering & Marine Services (Pte): EPC - Offshore pedestal cranes

Germanischer Lloyd AG: QA/QC services

Global Process Systems: FEED contract

Honeywell Pte Ltd. Main electrical and instrumentation building contractor for its H-04 wellhead platform

Petroleum Technical Services Company (PTSC): EPC - Two wellhead platforms

PetroVietnam Gas Investment and Construction JOC: Coating pipelines

Scorpion Offshore: Drilling rig

Vietsovpetro: O&M - FPSO

ERC Equipoise (ERCE): Independent reservoir evaluation evaluation of the Block 16-1, Te Giac Trang field (TGT) offshore Vietnam

Honeywell Process Solutions: contract to provide project management and engineering for the third platform at the Te Giac Trang (\'White Rhino\') field off southern Vietnam.


Sub Contractors:

J Ray McDermott: EPC - Transport and installation services - Sub Contracted by PTSC

Keppel Shipyard: EPC - FPSO conversion - Sub Contracted by Bumi Armada

EnerMech: Commissioned by Bumi Armada to provide leak testing services

Cathelco: Hull corrosion protection system for Keppel