Oil&Gas
Tutung Gas Field
2017-12-21 15:00  点击:0
VIP:1级

Project Profile


Value: US$100 million
Location: Bontang PSC, East Kalimantan (Timur) Province, Indonesia
Area: 2,180 sq km
Recoverable Reserves: Up to 100 billion cubic feet of gas

The Bontang PSC was awarded to PT Eksindo Petroleum Bontang in December 2003. The PSC covers an area of over 2,180 sq km both onshore and offshore in the Kutei Basin, East Kalimantan. The Recoverable reserves at Tutung discovery have been estimated at up to 100 billion cubic feet of gas.

Operator:

Ophir (Ophir bought Salamander in 2015): Operator with 100% interest

Contractor:

MB Century: Drilling Contract
联系方式