Project Profile
Value: US$920 million
Reserves: 325 billion ft³
Location: Natuna Sea, Block A, Indonesia
Start-up Year: 2011
The development will include topsides, jacket and associated pipelines. The Gajah Baru field has reserves of 325 billion cubic feet, equivalent to 54 million barrels of oil (mmboe). The CPP\'s deck will weigh 6,000-7,000 tonnes and will have living quarters for 60 people, pressure vessels, gas treatment and utilities. The jacket will weigh around 2,000 tonnes. Other scopes include a gas export pipeline from the Gajah Baru riser to a tie-in point on the West Natuna Transport System around 3.8km to the west of the platform.
Operators:
Premier Oil Natuna Sea BV: Operator with 28.67% interest
KUFPEC (Kuwait Foreign Petroleum Exploration Company): 33.33% interest
Petrobras: 15% interest
PTT Exploration and Production Public Company Limited: 11.5% inerest
Pertamina: 11.5% interest
Contractors:
Consortium for EPC and FEED contract:
SMOE Pte Ltd (SembCorp Marine)
Saipem SpA
Technip: Preliminary conceptual engineering work
Sub Contractor:
Nippon Steel Corporation: Fabrication of wellhead platform and CPP jacket for SMOE