Project Profile
Value: US$545 million
Potential Gas Reserves: 303 billion ft³
Potential Oil Reserves: 21 million bbl
Location: Approximately 140 km from the west coast of Mumbai and 40 km south of the Mumbai High Fields.
Development of the WO-5, WO-15, WO-16, B-119/121 and SB-14 oil and gas fields located in the Western Offshore will see the conversion of jack-up rig, Sagar Samrat, into a mobile offshore production unit; Construction of five well head platforms. This will include one nine-slot well head platform for WO-16, two six-slot platforms for SB-14 and B-119/121, one four-slot platform for WO-15 and another three-slot platform for WO-5; drilling of 16 development wells; and 114.83 km of associated pipelines.
Operators
ONGC (Oil and Natural Gas Corporation): Operator with 100% interest
Main Contractors
Engineers India Ltd (EIL): Consultancy - Preparing bid package for the well platforms and associated pipelines
Mustang Engineering: Consultancy - For conversion of the Sagar Samrat rig to a mobile offshore processing unit (MOPU)