Project Profile
Value: Undisclosed
Location: KG basin, 20 km off Amalapuram coast in Andhra Pradesh
Start-up Year: Late 2012
Peak Production: 9,400 barrels of crude oil per day
Water depth: 250 to 450 metres
Located at KG basin, 20 km off Amalapuram coast in Andhra Pradesh, the G-1 field\'s water depth is approximately 250 to 450 metres. The field operates through a subsea production system consisting of subsea production wells and production manifold. The wells are connected by dual subsea pipelines rising to the processing facilities onshore.
GS15 is a shallow water field lying 6 km offshore which includes two platforms GS15-4 (existing) and GS15-1 (new), and is integrated in the overall field development project.
Operators:
Oil & Natural Gas Corporation (ONGC): Operator with 100% interest
Contractors:
Leighton: installation of a sub-sea valve, topside extensions, the hook-up and pre-commissioning of topsides and the testing and onshore tie-in of sub-sea pipelines
Clough: Turnkey contract