Oil&Gas
Gendalo-Gehem Project including the Gendalo Hub (Gendalo, Maha and Gandang)
2018-07-20 17:00  点击:4
VIP:1级

Project Profile


Value: Undisclosed
Location: Makassar Strait offshore East Kalimantan
Water Depth: 6,000 feet
Estimated Production: 1.12 billion cubic feet of natural gas and 55,000 barrels of condensate
Start-up Year: 2016

The Chevron-operated Gendalo-Gehem developments are located in the Makassar Strait offshore East Kalimantan in water depths of approximately 6,000 feet. The project will include two separate hub developments, each with its own floating production unit (FPU), subsea drill centers, export gas and condensate pipelines and an onshore receiving facility. Gas from the project will be used both domestically and also converted to liquefied natural gas (LNG) at the Bontang LNG facility in Indonesia for export. Maximum daily production from the project is expected to be 1.12 billion cubic feet of natural gas and 55,000 barrels of condensate.

Operators:

Chevron: Operator with 80% interest

Eni SPA: 20% interest


Contractors:

Singgar Mulia: FEED - onshore receiving facility

Technip Indonesia: FEED – subsea, flowline system and two floating production units

Transocean: Drilling newbuild drillship Deepwater Asgard

WorleyParsons Indonesia: FEED - export pipelines

McDermott and PT Encona Inti Industri: Engineering, procurement and construction (EPC) contract
联系方式