Project Profile
Location: Off the coast of Sarawak
Start-up Year: -
The Sarawak Compression Modules and Tie-In Modification Project is operated by Shell and is located off the coast of Sarawak. Services will be extended from the existing engineering design service to include asset management, technical integrity, construction and maintenance planning and a range of specialist services to assist Sarawak Shell in completing an extensive work programme over the next few years.
In 2010 Shell celebrated the 100th anniversary of their operations in Sarawak. Malaysia’s first oil well, Miri Well No. 1 was drilled on top of Canada Hill by Shell in 1910, marking the birth of the exploration and production industry in the country.
Operators:
Shell Malaysia Ltd.: Operator with 100% interest
Contractors:
Fugro Subsea Services: Subsea inspection, repair and maintenance services
Kencana Petroleum: Fabrication of compression modules and tie-in modification
Ramunia Holdings: Topsides for Sarawak Shell platforms
Joint Venture for maintenance Engineering Services Contract
WorleyParsons
Ranhill Worley
Technip: EPCI contract