Project Profile
Location: Nigeria, Africa
Value: Undisclosed
Length: 18 km
Capacity: 20 mmscfd
Operation Start: 2020
The Calabar Gas Distribution Project involves the development of a new 18 km gas distribution pipeline with the capacity to supply up to 20 mmscfd (which would have the ability to generate power of 80MW). The CGD Project is intended to link the existing approximately 260 km Accugas pipeline network to the Calabar Free Trade Zone and the greater Calabar area. It is currently anticipated that the pipeline will be ready to supply gas from H1 2020.
Operator:
Accugas (Parent organisation of Savannah Petroleum)