Oil&Gas
Khurais Crude Increment Program
2020-08-07 16:18  点击:0
VIP:1级
A project to develop Khurais oil field along with Abu Jifan and Mazalij oil fields is called the Khurais Megaproject. The project began in 2006, is expected to cost $10 billion, and is expected to increase Saudi Arabia's export capacity from 11.3 to 12.5 million bpd. It will produce 1.2 million bpd Arabian light crude, as well as 315 million scfd of sour gas for Shedgum Gas Plant and 70,000 bpd of Natural Gas Liquids (NGL) for Yanbu Gas Plant. Foster Wheeler: a front-end engineering and project management services contract for full-field development Halliburton: 12 rigs and more than 400 wells, 232 oil-producers, 119 water-injectors and 58 observation wells. SNC-Lavalin and Saipem SA, in a joint venture: design and build the seawater injection plants. Veolia Water Solutions & Technologies: a reverse osmosis desalination system for the injection plants. Saipem: installation of four separation units, all the utilities, the seawater treatment plant and various seawater pipelines.
联系方式