Oil&Gas
Fogelberg Gas Field
2018-01-09 14:00  点击:0
VIP:1级
a high-pressure, high-temperature (HPHT) reservoir that contains between 600 billion and 2,400 billion standard cubic metres of gas, and between 1.3 billion and 5.8 billion standard cubic metres of condensate. A total of three subsea wells will be drilled and tied back to the Åsgard B platform. A moored semi-submersible drilling rig will be used to drill three production wells, and one drilling centre. Top sections will be drilled using water-based drilling mud, and lower sections using oil-based drilling mud. Fogelberg气田的预计总产量将达到6亿平方米至24亿平方米。该气田将在高温高压的油藏中开采,于此同时三口全新的油井将被开发用于该气田的开采。
联系方式