Oil&Gas
Suroriente Block
2018-01-19 14:41  点击:8
The development stages:Exploration drilling/2012-06,In production - under development/2013-05.The Suroriente block covers 36,527ha and is located in Colombia's Putumayo basin. The project belongs to state oil firm Ecopetrol (48%) and consortium Energy (52%). This consortium, in turn, is formed by Canadian firm Suroco, which holds 30.4%, giving it a 15.8% stake in the Suroriente block, and local company Vetra, which is the operator of the block by virtue of its 69.5% majority stake in the consortium. The block has 20 active wells which produced 15,545b/d in March 2014 at fields Quillacinga, Cohembí (both in production) and Quinde (under exploration). A net oil area containing deposits of an average 29° API was discovered in the Quillacinga field, at the Villeta U and T deposits. The Cohembí field is the block's most productive, with an output of 11,813b/d in March 2014, from the Villeta N sands. Its development started in 2012 with the drilling of seven wells and later, in 2013, four more were added. The drilling of up to four more wells is planned for 2014. The goal is to achieve full development of the field, with 20 active wells, by late-2014 or early-2015.
联系方式