Bolognesi LNG storage and regasification terminal
2018-01-19 14:41 点击:7
The development stages:Awaiting construction decision/2015-05.The LNG storage and regasification terminal is part of an integrated project that also includes a gas-fired thermal power plant and a pipeline. The terminal will supply 5.5Mm3d of LNG to the UTE, providing the 8.5Mm3/d surplus to the market. It will feature a permanent storage and regasification vessel.
联系方式