Faro Virgenes Field
2018-01-19 14:42 点击:10
Argentina-focused firm ArPetrol is currently drilling a well at its producing Faro Vírgenes license in Argentina's Santa Cruz province to revamp the deposit, which was originally discovered by YPF in the 70s and that was in production until 2002. The company's plans include drilling two more wells. ArPetrol expects an average production rate close to 200,000-300,000m3/d for each well.
联系方式