Project Profile
FPSO Type: Monohull - New build
Capacity: 2.2 MMbl,cm
Risers: 10
Mooring system: Spread
Water Depth: 1,200 metres
Field: Erha and Erha North Fields, Nigeria
Field Operator: ExxonMobil
Value: -
FPSO Operator: ExxonMobil
Contractors:
HHI: FPSO hull fabrication
SMOE and Sembawang Shipyard: Fabrication, integration, precommissioning and commissioning assistance of 14 modules of FPSO topside facilities weighing 17,000 metric tonnes
Saipem: Engineering, procurement, construction, towing and commissioning of the FPSO
Subsea 7: EPIC of flowlines, umbilicals, and jumpers, and modifications to the FPSO
Trelleborg: Contract from Subsea 7 to supply its high-temperature thermal insulation material for Phase 2 of the Erha North project, Nigeria. Trelleborg will supply several tons of high-temperature silicone insulation, Vikotherm S1, to the oil and gas flowlines in the field.