Project Profile
FPSO Type: Monohull - Conversion
Capacity: 1.6 MMbl
Oil Production: 120,000 bopd
Gas Production: 180 mmscfd
Water Injection: 150,000 bwpd
Mooring system: Spread
Depth: 2,141 metres
Field: Guara
Field Operator: Petrobras
The FPSO Cidade de Sao Paulo MV23 is deployed in the BM-S-9 (Guara) Block in the giant \"pre-salt\" region of the Santos Basin. Construction took place from Q1 2011 to Q4 2012. The first oil was achieved in January 2013. MODEC operates the FPSO for minimum 20 years.
FPSO Operator:
MODEC and Toyo Offshore Production Systems Pte Ltd joint venture known as MTOPS
Contractors:
CB&I: EPC contract
SOFEC: Designed and provided the spread mooring.