Complexo Gas-Quimico UFN-IV
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Value: Undisclosed
Location: Linhares, Espirito Santo, in southeast Brazil
Production: 1mtpa of ammonia and urea fertilisers, methanol, acetic acid, formic acid and melamine

The complex, once on stream, is expected to produce more than 1mtpa of ammonia and urea fertilisers, methanol, acetic acid, formic acid and melamine. The BED/FEED phase is scheduled to be completed by the end of 2013.

Operator:

Petroleo Brasileiro (Petrobras): Operator with 100% interest

Contractors:

Foster Wheeler: FEED contract, basic engineering design (BED) and technical assistance, beside training, during the engineering, procurement, construction (EPC) phase