Project Profile
Value: Undisclosed
Location: Cano Limon field in the province of Arauca to the Covenas maritime and tanker terminal
Capacity: 210,000 bpd
Length: 771 kilometres
The Cano Limon-Covenas Oil Pipeline, the second in length in the country, is approximately 771 kilometres long and has a maximum capacity of 220 thousand barrels per day. It is the pipeline by which crude oil from Cano Limon field in the province of Arauca is transported to the Covenas maritime and tanker terminal in the province of Sucre. The pipeline is owned by Ecopetrol and Occidental Petroleum Corporation. The pipeline was commissioned in 1986. In 2011, Ecopetrol and Occidental reach an agreement on Autonomy of Cano Limon-Covenas Pipeline.
Operators:
Ecopetrol
Occidental Petroleum Corporation