Oil&Gas
Bahia Blanca LNG Terminal
2019-03-15 09:39  点击:1
VIP:1级

Project Profile


Value: US$200 million
Location: Bahia Blanca, 400 miles souh of Buenos Aires, Argentina
Capacity: 500 mmscf/d (increase to 880 million cfd)
Start-up year: 2017

The plant, scheduled to come online in March 2013, will feed between 14-20 million cubic metres (490-705 million cubic feet) per day of re-gasified imported LNG into the national gas pipeline network via a connection with distributor Transportadora de Gas del Sur. In a second stage, the supply of gas will increase to as much as 25 million cmd (880 million cfd). The Bahia Blanca, located some 400 miles souh of Buenos Aires has a baseload regasification capacity of 500 mmscf/d

Operators:

YPF

Empresa Nacional de Energia (Enarsa)


Offtake Companies:

BP
Gazprom Marketing & Trading
Statoil

联系方式