Oil&Gas
Serrette Field
2017-12-21 15:00  点击:0
VIP:1级

Project Profile


Location: South East Coast of Trinidad
Water Depth: 280 feet (90 meters)
Production: 400mcf/d - 600mcf/d ( million cubic feet per day)
Priject Cost: US$588m

Serrette is a normally unmanned installation (NUI). It was locally designed by Fluor Summit Engineering and constructed locally at the Trinidad Offshore Fabricators (TOFCO) yard in La Brea, south Trinidad. It is the fifth platform to be built locally using a using the standardized \"clone\" approach which has allowed bpTT to deliver these platforms with increased efficiency and significant local content. The Serrette platform and jacket were installed in 2010.

Production from Serrette is tied into bpTT\'s Cassia B hub via a 26-inch diameter, 32-mile long pipeline. The platform is expected to average 400 million standard cubic feet a day (mmscfd) of gas and associated condensate from five wells. Production from this facility will supply the domestic market and Atlantic LNG\'s liquefaction plant for export as LNG to international markets, such as the US and Europe.

Operator:

BP Trinidad and Tobago (bpTT) – 100%

Contractors:

Fluor Summit Engineering – Constructed platform

Fluor: FEED for Cassia Compression hub. (May, 2017)
联系方式