Batalla de Santa Ines Grassroots Refinery Phase I
2017-12-21 15:00  点击:1
VIP:1级

Project Profile




Value: US$1,200 million
Start-up Month: Q4
Start-up Year: 2012
Refinery: 100,000 bbl/day
Power: 70 MW

The project will see the construction of a 100,000b/d refinery in the state of Barinas. Most of the plant\'s production will be used for internal consumption. The plant will initially produce 60,000b/d, which will eventually be increased to 100,000b/d. The plant will also have a thermo generation facility, which will add 70MW to the local grid.

Operator:

PDVSA (Petroleos de Venezuela SA)

Contractors:

Foster Wheeler: FEED contract

Intervep: pre-FEED contract

Consortium for Phase I EPC contract:

Foster Wheeler AG
Hyundai Engineering and Construction