Oil&Gas
Block BM-C-41 - Albiano, Tubarao Azul (former Waimea) and Pipeline oil Fields
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Value: US$1,000 million
Location: Block BM-C-41, Campos Basin
Area: 236 km²
Start-up Year: 2015

The project will see the exploration of the BM-C-41- 236 km² block. Drilling of the OGX-2 well has encountered an oil column of approximately 250 metres with over 100 metres of net pay. The reservoirs are conglomerates, sandstones and carbonates, with up to 20% porosity. The tests have confirmed the presence of high quality carbonate reservoirs and preliminary analysis indicates lighter oil in the deeper reservoirs. For the potential structure composed by Waimea and Fuji, OGX estimates a recoverable amount from 600 million to 1.1 billion barrels of oil.

After 12 months of production suspension at the Tubarão Azul field, the operator prepares for relinquishment and consequent abandonment. (September, 2016)

Operator:

OGPar (formerly OGX): Operator with 100% Interest

Contractors:

Diamond Offshore: Ocean Ambassador and Ocean Lexington drillships

GE Oil & Gas: Drilling and production equipment

Keppel FELS: EPC modification of OSX-1 FPSO

OSX Brasil S.A.: 20 lease of FPSO

SBM Offshore NV: EPC for FPSO OSX-2

Wellstream: Flexible risers, flowline mid-waterarches, umbilicals and associated equipment

Sub Contractors:

Aker Solutions: Oil separation equipment for the OSX-1 FPSO

BW Offshore: PMC for topside modifications and delivery of a Submerged Turret Production (STP) system for OSX-1 FPSO 

Dyna-Mac: Topsides for FPSO OSX-2

Jointly developed piling frames:

Large Diameter Drilling Ltd
MENCK
联系方式