Project Profile
Value: US$2,000 million
Location: Campos Basin, Offshore Brazil
Water Depth: 1,800m
Recoverable reserves: 1 billion boe
Production: 240,000 bpd of oil and 40,000 boepd of gas (November, 2017)
Production start-up: 1999
The project will see the development of the fourth phase at the Roncador field. The field is located in water depths 1800m . Petrobras will install an offshore platform (P-62) with the capacity of 180,000 bpd and 6 mcm per day natural gas production capacity.The field has been in production since 1999 with output, during November 2017, of around 240,000 barrels of oil per day plus around 40,000 boe per day of associated gas.
Operator:
Petrobras: Operator with 75% interest
Statoil: 25% interest
Contractors:
ABB: Power supply infrastructure, systems and equipment
Aker Solutions: Supplying sulphur recovery unit, Supplying offshore mooring system, To supply Pusnes Offloading System
Confab: Supplying two electrostatic treatment modules
DNV (Det Norske Veritas): Awarded P-62 classification
EBE - Empresa Brasileira de Engenharia: Supplying three gas compression modules, one gas booster compression module and one chemical storage module, including electro-mechanical assembly and commissioning (Package 4)
GE Nuovo Pignone: Supplying generators, compressors, technical advice for installation and startup plus training
Jaraguá Equipamentos Industriais: Supplying gas dehydration and glycol treatment system
Jurong Shipyard: Awarded pre-conversion contract for the P-62 FPSO
Renk Zanini: Supplying turbo reducers
Technip Engenharia S/A: Front-End Engineering Design
UTC Engenharia: Supplying gas de-hydration, water injection, carbon dioxide removal and sulphate removal modules (Package 2), Supplying three oil processing modules (Package 3)
Consortium:
Camargo Correa: To supply one module and carry out integration of the P-62 FPSO
IESA
Sub Contractor:
Lankhorst Mouldings Offshore Division: TriVIV Vortex Induced Vibration (VIV) suppression strakes for Saipem do Brasil