Persephone Project
2020-08-11 11:00  点击:0
VIP:1级

Project Profile


Value: US$1 billion
Location: Karratha, Western Australia
Depth: 126m
Discovery: 2006
Start-up Year: 2017

The Persephone gas field is located in offshore petroleum production license WA-1-L, some 135km, northwest of Karratha, Western Australia, in a water depth of about 126m. The field was discovered in 2006 by the exploration well Persephone-1, which is located approximately 8km north-east of the North West Shelf Project’s North Rankin Complex.

The North Rankin Complex, which will take gas from the Persephone, is a single integrated facility comprising the interconnected North Rankin A (NRA) and North Rankin B (NRB) platforms and associated subsea infrastructure, including two export trunklines which run between NRC and the onshore Karratha Gas Plant (KGP).

The project involves a two well, 7km subsea tieback from the Persephone field to the existing North Rankin Complex. The total investment for the project is expected to be approximately A$1.2 billion (US$916 million) , with project start-up expected in early 2018. Woodside will operate Persephone, and holds a 16.7% stake alongside project partners including BP, Chevron, Shell and BHP Billiton.

Operators:

Woodside Energy: Operator with 16.7% interest

BHP Billiton Petroleum (North West Shelf): with 16.7%

BP Developments Australia Pty Ltd: 16.7%

Chevron Australia Pty Ltd: 16.7%

Shell Development (Australia) Pty Ltd: 16.7%

Other: 16.5%


Contractors:


Subsea 7 S.A.: Contract awarded by Woodside Energy Ltd for the Persephone Work Pack 2 Fabrication, Subsea Installation and Diving Services project, offshore Australia. The contract comprises fabrication, transportation, installation and pre-commissioning activities within the principal scope of work, with additional deconstruction and pipeline suspension work. Project management and engineering will commence immediately from the Company\'s office in Perth, Australia, with offshore operations scheduled to commence in the fourth quarter of 2015.

FMC Technologies: Construction of production manifold


Subcontractors:

Civmec has been awarded oil and gas contract on behalf of FMC Technologies. Civmec will start fabrication, surface treatment and testing of a production manifold.

EnerMech: Contracted to perform a range of subsea flowline and umbilical pre-commissioning.