Project Profile
Value: Undisclosed
Location: Onshore Perth basin, Western Australia, Australia
Production: 7.7 TJ and 360 barrels of condensate per day
Area: 7 square miles (18 square kilometres)
Start-up Year: 2013
Joint Venture parties of EP 389 have been granted Petroleum Production Licenses L 18 & L 19 by the Western Australia Department of Minerals and Petroleum over the two exploration blocks, which covers approximately 7 square miles (18 square kilometres) incorporating the Red Gully-1 and Gingin West-1 producing fields and the Red Gully Processing Facility. The Red Gully-1 and Gingin West-1 wells have been producing gas and condensate on an Extended Production Test (EPT) through the Red Gully Processing Facility since first gas was produced in June 2013 and commissioning of the facility occurred in September 2013. The Red Gully-1 B Sands were perforated in late June and have since tested via production through the facility with average daily sales for the September Quarter of 7.7 terajoules (TJ) and around 360 barrels of condensate per day. Joint Venture Interests in L 18 and L 19 and PL 96 are Empire Oil & Gas NL (Empire Oil Company (WA) Ltd.) and ERM Power (ERM Gas Pty Ltd.).
Operators:
Empire Oil & Gas NL (Empire Oil Company (WA) Ltd.): Operator with 76.39% interest
ERM Power (ERM Gas Pty Ltd.): 23.61% interest