Project Profile
Value: Undisclosed
Location: Carpentaria Basin region of North Queensland, Australia
Area: 3,000km2
Reserves: 22.5 TCF of gas and 242 Million barrels of associated liquids
Start-up Year: -
Armour Energy is the preferred tenderer for ATP 1087 in the Carpentaria Basin region of North Queensland. Following the grant of the tenement, Armour Energy is planning to commence the ATP 1087 exploration program in April 2013 to coincide with the North Queensland dry season, or earlier if weather permits. The exploration program is being designed to commence the delineation of substantial gas resources across a 3000km2 fairway within the tenement area. Previous assessment of the tenement’s resource potential carried out for Armour Energy by independent consultants (MBA Petroleum Consultants) determined a mean technically recoverable Prospective Resource estimate for ATP 1087 of 22.5 TCF of gas and 242 Million barrels of associated liquids. The P90 (90% Probable Case) prospective resource estimate for the area was 9.4 TCF of gas and 59 Million Barrels of associated condensate.
The main evidence for prospectivity in the Basin is the very strong and consistent gas shows in the drilling mud across a 125 metre section of the Lawn 4 formation in the Egilabria 1 well, which was drilled by Comalco in the 1990s in what is now ATP 1087. The Lawn 4 formation is interpreted to contain up to 8%. Total Organic Carbon and a gas charged brittle shale suitable for lateral drilling and hydraulic fraccing to stimulate gas production. This result was supported by similar results in the Beamesbrook, Desert Creek and Argyle Creek wells across the tenement. The Lawn 4 formation is of a similar geological age and characteristic as the Barney Creek Shale in the Northern Territory Exploration Permits held by Armour Energy. The Barney Creek Shale has been proven to be the source rock of the Glyde River gas discovery made by Armour Energy in August 2012. The Glyde 1 lateral well flowed gas at a rate of 3.33 million standard cubic feet per day equivalent (mmscf/d) at 125 psi pressure after 10 minutes on a 1 inch choke. Armour Energy is also the preferred tenderer for ATP 1107 which is located immediately south of and adjacent to ATP 1087. ATP 1087 and ATP 1107 cover the south Nicholson Basin and underlying Mt Isa Super Basin which extends westward into the company’s Northern Territory applications.
Operators:
Armour Energy: Operator with 100% interest
Contractors:
Halliburton Energy Services: Perform a six stage hydraulic stimulation
MBA Petroleum Consultants: Reserves estimation and geological studies
SRK Consulting: Independent certifier of the Contingent Resources relating to the Lawn Hill Shale Formation in Egilabria