Oil&Gas
Red Gully Project - EP 389
2017-12-21 15:00  点击:0
VIP:1级

Project Profile


Value: Undisclosed
Location: EP 389, onshore Perth basin, western Australia
Capacity: 10 million cubic feet of gas and associated condensate
Production: 2,300bbls/day
Pipeline length: 3 kilometre
Start-up Year: -

Red Gully project is located in EP 389 in the onshore Perth. The Red Gully Empire has previously estimated the cost of the Red Gully gas and condensate plant at US$30.4 million, with Alcoa funding US$28 million of the costs as part of a sales agreement signed in 2011. Once completed, the Red Gully facility will be capable of processing 10 million cubic feet of gas and associated condensate. EP 389 lies in the onshore Perth basin and contains the Gingin West-1 and Red Gully-1 wells which flowed condensate rich gas during testing. As of 2014, Empire Oil & Gas NL (Empire Oil Company (WA) Ltd.) Operator - 76.39 percent ERM Power (ERM Gas Pty Ltd.) - 23.61 percent

Empire Oil & Gas has handed out a series of awards related to the construction of its Red Gully project in EP 389, onshore Western Australia. Empire had awarded Thistle Fabrication a pipeline construction contract which involves the welding, x-raying, pressure testing and burying of a three kilometre export pipeline. The pipeline will run from the Red Gully processing facility to the tie-in point to the Dampier to Bunbury natural gas pipeline. Empire also handed out a notice of award to Primero Group for the construction contract to install the Red Gully gas and condensate plant. Lenane Holdings has won the earthworks contract related to the project, with Empire saying work at the site was already well advanced with gravel sheeting and compaction part of the current operations. Empire also revealed that all long lead items, pipework and valves necessary for the Red Gully plant had been secured.


Operators:

Empire Oil & Gas NL (Empire Oil Company (WA) Ltd.): Operator with 76.39% interest

ERM Power (ERM Gas Pty Ltd.): 23.61% interest


Contractors:

Thistle Fabrication: Pipeline construction contract

Primero Group: Construction contract to install the Red Gully gas and condensate plant

Lenane Holdings: Earthworks contract related to the project

Enerdrill: Drilling contract for drilling of up to three wells (subject to successful fundraising). One of these is planned to be within Permit 389, which hosts Empire\'s Red Gully Gas and Condensate Project.

Aztech Well Construction: A contract to provide extensive independent technical evaluations. (June 2016)