Oil&Gas
Palm Valley Gas Field - Amadeus Basin
2020-07-29 11:22  点击:0
VIP:1级

Project Profile


Value: Undislcosed
Location: Central Australia, near Petermann
Reserves: unknown
Start-up Year: 1983
Production: 4,700,000 Cubic Feet of gas per day

Palm Valley is a gas field located in Central Australia, near Petermann. It was discovered in 1965, and gas production commenced in 1983. The field currently produces from 4 wells and the gas is delivered to Alice Springs via a 134 kilometre pipeline. Palm Valley facilities include field boost compression. The production is currently at 4,700,000 Cubic Feet of gas per day and the operators are Magellan Petroleum with 52.02% and Santos with 47.98%.


Operators:

Central Petroleum: Operator with 100% interest


Contractors:

Netherland, Sewell & Associates, Inc. (NSAI): Contract for the estimated petroleum reserves and contingent resources for the 100% owned Palm Valley Field and Dingo Fields
联系方式