Project Profile
Location: South Australia
Start-up year: Feb 2012
Production capacity: 2,000 barrels of fluid per day
Area: 7.84 sq km
The Growler oilfield lies within permit PPL 242.
Growler-7 was the fifth well of the joint venture’s 11 well exploration and appraisal drilling programme in PRL 15 and PEL 104. The Growler-7 well is expected to be brought online as an oil producer in early February 2012.
Operator:
Senex Energy: Operator with 60% interest
Beach Energy: 40% interest
Contractors:
Ensign: Drilling contract