Project Profile
(Additional Researched project information)
Value: US$3,000 million
Start-up Year: 2018
LNG: 3 million tonne/year
Location: Tassie Shoal, Timor Sea
The project will see the construction of a proposed single train 3 million tonnes/year LNG plant on Tassie Shoal, adjacent to methanol plant. The facilities will have two concrete structures located in 15 metres of water supporting conventional steel LNG storage tanks, with LNG production module suspended between the two concrete bases.
Operator:
MEO Australia Limited: Operator with 100% interest
Contractors:
Arup: Cost reports
APCI: Cost reports
WorleyParsons: Cost reports