Oil&Gas
Cheal and Cardiff - PMP 38156- Taranaki Basin
2020-07-27 11:44  点击:0
VIP:1级

Project Profile


Value: US$30 million
Location: PML 38156, Taranaki Basin, New Zealand
Reserves: 4 million bbl
Start-up year: 2007

PMP 38156 comprises the Cheal and Cardiff fields. TAG is producing from Cheal, with Cardiff under development.

Cheal is producing from the Miocene-aged, Mt. Messenger (~2,000 metres) and Urenui (~1,600 metres) formations. ongoing development and step-out drilling in the surrounding acreage has achieved a track record of drilling success, with most of the prospect-rich discovery acreage yet to be explored.

The Cheal A site is the location of the Cheal production facility, which was completed in September 2007 and began producing that month.

TAG has completed its first deep well, Cardiff-3, (~4,000 metres) appraisal well which discovered gas-condensates across a large hydrocarbon column in three separate zones.


Operator:

TAG Oil Ltd.: 100% interest
联系方式