Project Profile
Value: US$37,000 million
Location: Barrow Islands, off the Pilbara coast, 85 Kilometers north – north – east of onslow and 140 Kilometres west of Karratha
LNG: 15 Million tonnes per year
The projects will see the proposed establishment of a midstream development, which will includes an LNG facility on Barrow Island, which lies directly between the gas fields and the mainland. The LNG plant will have three trains, with a nominal capacity of 5 million tonnes per annum each (Train 1 due online 2014). The LNG plant can only be 300 hectares big under the 2003 Barrow Island Act. The joint venture partners have letters of understanding for the long-term supply of up to 4 million tonnes of LNG per annum to North American West Coast. There will also be a domestic gas plant, with a capacity of 256 MMcf/d (300TJ/d) is part of the project.
The CO2 re-injection scheme would transport produced CO2 from the Gorgon field and re-inject it into the Dupuy reservoir 2,500m below Barrow Island. If successful, the intended technology would reduce the LNG project’s CO2 emissions from 9.5 million tonnes per year to 3.5 million tonnes per year.
The Gorgon reservoir has 12.9tcf of gas in a water depth of 220m. It is also high in CO2 (in the 10-15% range) and is HT/HP (130 degrees c/360 bar). The Jansz Reservoir is lean with low co2 (1%) and is located in 1350m of water. There are plans to increase the capacity of the trains to 7/8 mtpa. The Final Investment Decision was approved on 14 September 2009.
Gorgon condensate has an API gravity of about 52.9 degrees and a sulphur content of 0.0088%.
Operators:
Chevron Australia: Operator with 47% interest
Shell: 25% interest
ExxonMobil: 25% interest
Osaka Gas: 1.25% interest
Tokyo Gas: 1% interest
CHUBU Electric Power Co: 0.417% interest
Contractors:
AGC Industries: Pipe spools
Agility: Supply and transportation
Air Products & Chemicals Inc.: Proprietary LNG process technology and equipment for the 3 LNG trains
Aker Process Systems: Monoethylene Glycol (MEG) system
Aker Solutions: Subsea umbilicals
Allseas: Pipeline installation
Areva T&D: Electrical system, switchgear and other equipment
Boskalis Westminster: Port construction
CB&I: EPC - LNG and condensate storage tanks
CCR Technologies Ltd.: MEG regeneration and reclamation system
China Offshore Oil Engineering Company (COOEC): 50,000 tonnes of pre-assembled racks to be built in modules and 10,000 tonnes of pre-assembled units
CO2CRC Technologies Pty Ltd.: CCS unit
COOPER Crouse-Hinds: Explosion-proof fluorescent light fitting
DB Schenker: Global transport of materials, equipment and two semisubmersible ships
Dockwise: Transport onshore LNG modules
Enerflex Systems Ltd.: DOMGAS custody transfer metre station
Ertech: General services contract: multi-skilled workforce and equipment to support construction activities of gas processing plant
Fairstar Heavy Transport: Transport modules and project materials
GE Oil & Gas: Compressors and 130 MW gas turbines
Hudong-Zhonghua Shipbuilding Group: LNG carriers
Hyundai Heavy Industries (HHI): EPC - 48 processing facilities and modules
J Ray McDermott: Pre-assembled racks
John Holland: Design and construction of permanent buildings
KBR: Downstream concept selection study
Kellogg Joint Venture Group (KJVG) – KBR, JGC, Clough and Hatch - Engineer, Procure and Construction Manage (EPCM) contract
Kencana Petroleum Berhad: Pre-assembled racks for the fabrication of the LNG jetty and marine structures
Kentz and Chicago Bridge & Iron (CB&I): Structural, mechanical, piping, electrical, instrumentation and commissioning support
Kentz Engineers & Constructors: Telecommunication package
Kyushu Electric Power – offtake (LNG) contract
Leighton Contractors Pty Limited: Civil and underground works package
LogiCamms: Maintenance services
Mallesons Stephen Jaques: Legal advisor for Chevron
McLaren Software: Enterprise EngineerTM software and services
Mermaid Marine Australia Ltd. (MMA): Stevedoring services for Gorgon supply base
Mitsui OSK Lines: HoA with ExxonMobil to construct and the long term charter of LNG vessels
Monadelphous: Facilities management services
Noskab Electrical: Medium voltage power cables and accessories
NYK-Hinode Line: Long-term shipping contract to transfer LNG plants
Pearson-Harper Limited: Engineering information management (EIM) services
ROSEN Group: baseline pipeline inspections
Tag Pacific Limited: Design, manufacture, and commissioning of 28 MW electric power generation plant
Technip: LNG plant construction study
Thiess Group: Construction of site preparation and temporary facilities
Toll Energy: Manage logistical services
Torgy Atlantic Ltd.: Thermal pipe supports
UXC Ltd.: Entertainment system
Wah Seong Corporation Berhad: Pipe coating
Waterplex: Installed mega litre water bladder tanks for water storage
Wilhelmsen Ships Service: Logistics services
Consortium company: JPKT (Technip and J P Kenny): FEED - Deepwater upstream facilities (subsea export line)
Consortium to design and construct an accomodation village at Barrow Island:
Kentz Engineers & Constructors
Thiess Group
Demcil Group
Consortium for electrical works:
Thiess Group
Kentz Engineers & Constructors
Consortium for EPC of LNG jetty and marine precinct:
Leighton Contractors Pty Limited
Saipem SpA
Consortium to supply pipeline supply contract for Gorgon and Jansz export flowlines and the projects domestic pipeline:
Marubeni Corp.
Itochu Corporation
JPE Steel Corporation
Consortium for communication systems:
Amstar Communications
NewSat Limited
Consortium for gas pipeline installation from Barrow Island to Dampier-Bunbury:
Sea Trucks Group
Clough Limited
Monadelphous Group Limited: Three-year facilities maintenance services contract associated with the Barrow Island assets operated by Chevron Australia Pty Ltd (Chevron). The contract is for the operation and maintenance of support facilities and associated utilities, and includes water and wastewater treatment plants, power generation and distribution systems, as well as the management and maintenance of various buildings, vehicles, plant and equipment. Approximately 500 people are expected to be employed to perform the work under the contract.
Civmec: Through its new division offering refractory maintenance services has secured contracts the LNG project. Civmec will be required to carry out refractory installation work on Chevron’s Gorgon LNG project. The contract includes supplying services to execute refractory installation works to stringent international standards. (October, 2015)
Gorgon Upstream Joint Venture (GUJV): Wood Group & Technip
- Deliver FEED services and provide detailed engineering, procurement, and construction management (EPCM) services for Gorgon’s upstream facilities. (2005)
Sub Contractors:
Combi Lift: Semisubmersible ships awarded by Schenker
Muhibbah Engineering (M) Bhd.: Pre-assembly of heavy lifting facility, tug pen breakwater caissons and preparation of shipping barges for Saipem/Leighton
Neptune Marine Services: Diving support services for Boskalis Australia
Saleem Technologies: Track and manage construction materials for Leighton Contractors
Westsea Marine: Supported vessels for Saipem/Leighton