Project Profile


Value: US$20.4 billion
Location: Curtis Island, near Gladstone, Australia
Start-up Year: 2014
LNG: 8.5 million tonne/year

The plans for the project involve:
- Expanding QGC’s existing coal seam gas production in the Surat Basin of southern Queensland
- Building a 540km buried natural gas pipeline network linking the gas fields to Gladstone
- Constructing a natural gas liquefaction plant on Curtis Island, near Gladstone, where the gas will be converted to LNG for export

The project’s first stage will comprise two processing units, known as LNG trains, at the Curtis Island plant. These trains, which have a design life of at least 20 years, will produce a combined 8.5 million tonnes of LNG a year.The site can accommodate an expansion to 12 million tonnes of LNG a year, subject to demand. Construction is scheduled to begin in 2010, with the first LNG delivery expected in 2014. The proposed LNG plant will occupy less than 1% of Curtis Island and will be separated from public areas by an environmental protection zone.


Operators:

Queensland Gas Company (QGC) is made up of constituent companies:

Shell: 73.75% interest of the two liquefaction units
Toyota Tsusho (Australasia) Pty. Limited
CNOOC Australia Energy Pty. Ltd.: 25% interest
Tokyo Gas Australia Pty. Ltd.


APA Group: Operator of the pipeline system
(543 kilometre pipeline network linking natural gas fields and the Queensland Curtis Liquefied Natural Gas (QCLNG) export facility - sold to APA on June 2015)


Contractors:

ABB: Provide planned and unplanned maintenance for the up- and mid-stream facilities at QCLNG

ATCO Australia: Built modular camp

Bruhl Roadworks: Earthmoving contract

Consortium for water treatment plant:
GE Betz Pty Ltd.
Laing O’Rourke Construction Pty Ltd.

Bechtel Australia: EPC LNG Plant

Baosteel: UOE pipes

Consortium for Pipeline construction contractor:

Consolidated Contracting Company Australia Pty Ltd
McConnell Dowell Constructors

Clein Excavations: Earthmoving contract

Clough Limited: Site civil works and front-end planning work, construction and fabrication of eight field compression stations and two central processing plants

Decmil Group: Wellsite installation services contract and 2015 contract extension which will see Decmil move from project phase to operational phase, supporting QGC with wellhead construction, logistics, material management and a range of construction services for 2015. In 2016, the company won an extension to its QCLNG wellsite installation services contract. The US$25 million deal is an extension to the existing framework contract with QGC and is held by Decmil’s unit Eastcoast Development Engineering. Under the contract extension, Decmil will continue to support QGC’s operations with wellhead construction, logistics, material management and a range of construction services through 2016. In May 2016 Decmil secured a new two year framework Agreement with QGC Pty Ltd. for brownfield Projects within the Surat Basin in Queensland, Australia. The framework Agreement will span the remainder of 2016 and to April 2018 and the scope includes the provision of construction activities, structural, mechanical and piping (SMP) services across a number of QGC\'s brownfield projects. In November 2016 the company was awarded an extension for the wellsite installation until June 2017.

Earthmoving of Tara: Earthmoving contract

Ezion Holdings: Logistics and support services for the haulage of equipment and modules

Fletcher Building: Supply of polyethylene pipe

GE Oil & Gas Australia Pty Ltd: Maintenance contract to support carbon-efficient turbines and other equipment

GL Noble Denton: Verification services

Incat Crowther: Deployed catamarans

Jacobs Engineering Group Inc: Concept study and pre-FEED contract

Jeff Reid Earthmoving of Emerald: Earthmoving contract

Kentz Corporation (Australia): Commissioning services

McConnell Dowell (Australia): Transmission pipeline network EPC

Mike Jones Earthmoving of Wandoan: Earthmoving contract

Monadelphous Group: O&M contract

Morris Corporation: Camp management contract extension

Murphy Pipe and Civil Constructions: Install gas and water gathering pipelines

Ostwald Bros of Dalby: Earthmoving contract

Petrofac: Work Management Systems development & implementation contract

Qedi: Proprietary commissioning technology and consultancy

Riverside Marine: Deployed catamarans

Rotork: Supply valve actuation products

Spotless Group: Catering, cleaning and maintenance services

Surat Basin Builders: Build 27 homes

Tipper Hire of Chinchilla: Earthmoving contract

Transfield Services: Site civil works and front-end planning work, construction and fabrication of eight field compression stations and two central processing plants. In addition, regular maintenance on gasfield and pipeline facilities

Trelleborg: Supply docking and mooring equipment and monitoring software

Thiess: Build the gas processing facilities and construction of 18 field compression stations and four central processing plants

Tyco Water: Pipe supply contract

T&W Earthworks: Earthmoving contract

Vantage Holdings: Build 27 homes

WellDog: Provision of downhole gauge systems

WorleyParsons: Detailed engineering and procurement services

Motorola Solutions: Contract to manage and support network operations for QGC’s liquefied natural gas project in southern Queensland

Leighton Contractors (CIMIC Group’s construction company): Selected to deliver gas infrastructure. The project is expected to generate revenue of approximately US$250 million to Leighton Contractors over 18 months. Construction is expected to begin in late 2015 for completion in 2017. (November 2015)


Sub Contractors:

AJ Lucas Group Limited: Construction and installation of gas and water trunklines

Coates Hire: Supplied a range of long distance water pumping equipment

EBARA Pumps Australia Pty., Ltd.: 4 Transfer and 9 loading pumps – Contracted by Bechtel

GE’s Power & Water: Power generation and water filtration equipment to water treatment plant for GE Betz Pty Ltd. and Laing O’Rourke Construction Pty Ltd.

KBR Australia: Sub Contracted by McConnell Dowell (Australia) for engineering design services for three coalbed methane pipelines

Leighton Contractors: Construct accommodation village by Bechtel

Strategic Marine: Design, fabrication and engineering works for John Holland’s material offloading facilities

EnerMech: Contracts for the air drying and nitrogen purging of all six gas storage tanks at Queensland’s Curtis Island LNG development. Tank capacities range between 140,000 m3 and 160,000 m3 of LNG and is roughly the equivalent volume of 56 Olympic-size swimming pools per tank. In addition to the air drying and nitrogen purging, EnerMech has now been engaged by Bechtel to undertake pre-commissioning work across the three Curtis Island projects, with services including lube oil flushing, chemical cleaning, nitrogen purging and pressure testing, high-pressure water jetting, painting and blasting, rope access, valve testing and repair, and blowing and drying.