Oil&Gas
Meadow Creek SAGD oil Sands Development
2017-12-21 15:00  点击:0
VIP:1级

Project Profile


Location: 45 km south of Fort McMurray, northeast Alberta, Canada
Capacity: 120,000 barrels per day (East & West)
Area: 150 sq km (West)
Start-up Year: 2026 (West), 2025 (East)

The project is a steam-assisted gravity drainage (SAGD) oil sands development and is jointly held by Suncor Energy and Nexen Energy ULC. Jacobs is working with Suncor to standardize the central processing facility design. The objective of this replication strategy is to reduce capital costs and maximize the potential delivery of industry-leading returns.

Meadow Creek East

The Meadow Creek East program is planned over two phases, with the anticipated construction of a nominal 40,000 bpd central processing facility replicated in each phase.

Meadow Creek West

The project will be developed in one stage with an anticipated production of 40,000 bpd.


Operators:

Suncor Energy: Operator with 75% interest

Nexen Energy ULC: 25% interest


Contractors:

Jacobs Engineering Group Inc.: Contract from Suncor Energy to provide project management and engineering services to complete the design basis memorandum (DBM) (December 2015)
联系方式