Project Profile
Location: Eagle Ford shale region, Gardendale area, Cotulla, Texas, USA
Capacity: 35,000 bopd
Length: 42 miles
Start-up Year: 2014
On June 2015, Twin Eagle Resource Management, LLC proceeded with the acquisition of a 100% interest in StarMex Big Wells, LLC, a 42-mile crude oil gathering system pipeline in the Eagle Ford shale region that connects to the major long-haul pipelines in the Gardendale area. StarMex Big Wells will be renamed Twin Eagle Gardendale Pipeline, LLC. Located in one of the Eagle Ford’s most prolific areas, the system is surrounded by several producers with substantial production and significant continued drilling plans. The pipeline system has capacity of 35,000 bopd and is backed by long-term, fee-based contracts with existing customers that are committed to ship approximately 24,000 bopd. This project consisted of 4,726-feet of 10-inch pipeline, 23,368-feet of 6-inch pipeline, 38,362-feet of 8-inch pipeline, and 15,470-feet of 4-inch pipeline.
Operators:
Twin Eagle Resource Management, LLC: Operator with 100% interest
Contractors:
Midway Energy Services: EPC contract for the main pipeline system