Project Profile
Value: Undisclosed
Location: transported from Baton Rouge, Louisiana, Collins and Pascagoula, Mississippi, and Belton, South Carolina, to North Augusta, South Carolina, Savannah, Georgia, and Jacksonville, Florida, USA
Capacity: up to 167,000 barrels per day
Length: unknown
Start-up Year: -
The proposed Palmetto Pipeline of Kinder Morgan will enable refined petroleum products to be transported from Baton Rouge, Louisiana, Collins and Pascagoula, Mississippi, and Belton, South Carolina, to North Augusta, South Carolina, Savannah, Georgia, and Jacksonville, Florida. The system will have a design capacity of up to 167,000 barrels per day and will consist of a segment of expansion capacity that Palmetto will lease from Plantation Pipe Line Company between Baton Rouge, Louisiana, and Belton, South Carolina. A new 360-mile pipeline from Belton, South Carolina, to Jacksonville, Florida, will also be constructed as part of the system. Pipelines are the safest and most environmentally sound way to transport refined products, and Kinder Morgan’s safety and environmental performance is significantly better than the pipeline industry average. Kinder Morgan, Inc. (KMI) received approval from the Federal Energy Regulatory Commission (FERC) regarding the rates, terms and conditions of service for the proposed Palmetto Pipeline on May 1, 2015.
Operators:
Kinder Morgan: Operator with 100% interest