Project Profile
Value: Undisclosed
Location: from Delta House platform, Mississippi Canyon protraction area, Gulf of Mexico, USA
Capacity: 220,000 b/d
Length: 120 miles
Start-up Year: April 2015
A joint venture of Shell Pipeline Co. LP and Genesis Energy LP have launched the Odyssey Pipeline System. On April 2015, the companies transported the first crude oil production from the Delta House platform in the Mississippi Canyon protraction area of the Gulf of Mexico. Odyssey, which is operated by Shell, is a 120-mile network of crude oil pipelines varying 12 to 20 in. in diameter. The pipeline has the capacity to deliver as much as 220,000 b/d. The Delta House platform is a deep-water floating production system with subsea ties to three Mississippi Canyon fields.
Operators:
Shell Pipeline Co. LP and Genesis Energy LP: Operator with 100% interest