Algar Lake SAGD Project
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Value: Undisclosed
Location: 60 km southwest of Fort McMurray, Regional Municipality (R.M.) of Wood Buffalo, Alberta, Canada
Area: 56,960 contiguous acres
Reserves: 114 million barrels plus 35 million barrels of contingent resources
Production (peak): approximately 18,000 barrels per day
Depth: approximately 225 metres
Start-up Year: -

Grizzly Oil Sands ULC holds a 100 percent working interest over McMurray sand deposit at Algar Lake which covers an area of 56,960 contiguous acres. The asset has been extensively explored with 65 cored delineation wells and a further 16 appraisal wells, plus 2D and 3D seismic. The reservoir lies at a depth of approximately 225 metres, with up to 20 metres of net pay along a continuous channel. It has few complexities such as mud/clay intervals within the sands or bottom water, and has a continuous cap rock. Drilling cores show sand from top to bottom. This is conducive to reliable, predictable future reservoir performance. Algar Lake is also relatively close to infrastructure, requiring only 11 km of new road. It adjoins a competitor’s producing SAGD project, and lies approximately 60 km southwest of Fort McMurray.

Algar Lake was independently evaluated by GLJ Petroleum Consultants Ltd. at December 31, 2013. GLJ assigned proved plus probable reserves of 114 million barrels plus 35 million barrels of contingent resources. Algar Lake’s resource base is well-suited to a smaller producing scale of up to three ARMS cores, with SAGD production designed to peak at approximately 18,000 barrels per day. The regulatory application for the first two phases of development at Algar Lake was filed in March 2010 and was approved in December 2011. The initial 10 horizontal well-pairs for phase 1 were drilled and completed from a single pad in mid-2012.

Operators:

Grizzly Oil Sands ULC: Operator with 100% interest

Contractors:

GLJ Petroleum Consultants Ltd.: Independent resource estimation study