Oil&Gas
Douglas Rail Terminal
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Value: Undisclosed
Location: Douglas city in Converse County, Wyoming, Powder River Basin, USA
Capacity: 60,000 barrels per day of crude oil (with expansion capacity of up to 120,000 barrels per day)
Start-up Year: March 2014

Enserco Midstream, LLC, a subsidiary of Twin Eagle Resource Management, LLC, will build and operate a crude oil trans-loading terminal to serve producers in the Niobrara and Bakken shale formations and from Canada. The new facility will be built in Douglas, the heart of the Powder River Basin in Converse County, Wyoming, USA. The Douglas Rail Terminal will have unit train capability on the main line of the BNSF Railway, along with crude oil storage capacity for efficient operation. In the future, it is expected the facility will handle NGL trans-loading as well. The facility will have two rail loops with ladder tracks to handle NGL transloading. It will be capable of receiving crude oil trucks and will be connected to local crude oil pipelines. Rail-loading capacity will be approximately 60,000 barrels per day of crude oil with expansion capacity of up to 120,000 barrels per day. Manifest operations are expected to begin in June 2013 with full unit train operations available in March 2014.

Operators:

Twin Eagle Resource Management, LLC (through subsidiary Enserco Midstream, LLC): Operator with 100% interest
联系方式