Project Profile
Location: Burnaby, East of Vancouver, British Columbia, Canada
Capacity: 250,000 m3 (1.6 million bbl) with 13 storage tanks
Start-up Year: 2017
The Burnaby terminal is the terminus of the TMPL mainline. It receives both crude oil and refined products for temporary storage and distribution through separate pipelines to local terminals, a refinery and the Westridge marine terminal. The Burnaby terminal has 13 storage tanks with an overall volume of 250,000 m3 (1.6 million bbl). The terminal is planned to be expanded in 2017 through the TMPL Expansion project.
Operators:
Trans Mountain Pipeline TMPL (Kinder Morgan): Operator with 100% interest