Oil&Gas
Delta House FPS - Mississippi Canyon Block 254
2017-12-21 15:00  点击:2
VIP:1级

Project Profile


Value: US$2 billion
Location: Mississippi Canyon 254, Gulf of Mexico, USA
Start-up Year: 2015
Capacity: 80 MBOPD, 200 MMCFD, and 40 MBWPD
Water Depth: 1,890m – 6,237ft

Delta House will include a floating production system (FPS), an oil export line, a gas export line and a number of subsea systems. The Delta House FPS will be located in Mississippi Canyon 254 and is designed to accommodate production from a number of nearby fields, including LLOG’s previously announced discoveries in Mississippi Canyon 300 and Mississippi Canyon 431. The oil and gas export lines will connect the FPS to existing downstream pipeline infrastructure. The FPS will have capacity of 80 MBOPD, 200 MMCFD, and 40 MBWPD and space for 20 risers, which will allow production from up to nine simultaneously producing fields with dual flowlines. The FPS will have peaking capability up to 100 MBOPD and 240 MMCFD. The Facilities are expected to process and transport production from six initial wells when they begin commercial operation in 2015. Total capital required for the Project is over US$2B. The Delta House FPS will use the OPTI-11000® semi-submersible hull design developed by Exmar Offshore Company. In 2016, the Delta House floating production system achieved its nameplate oil capacity of 80,000. The FPS uptime has averaged in excess of 99% since production was initiated which we believe is best in class for similarly sized facilities.


Operators:

LLOG Exploration: Operator with 100% interest


Contractors:

Audubon Engineering: FEED contract

BMT Scientific Marine Services: Provide an Environmental and Facility Monitoring System (EFMS)

Dockwise: Hull transportation

Exmar: Drilling contractor

First Subsea: Supply subsea mooring connectors

FMC Technologies: Subsea equipment

Hyundai Heavy Industries: EPC contract for hull construction

Intermoor: Design, fabricate and install mooring systems

Kiewit: EPC contract for topside fabrication

Multi Phase Meters: Subsea and SURF contract

Seadrill Ltd: Drilling contract using the drillship West Neptune (UDW drillship)

Technip: Project management, engineering, fabrication, installation and pre-commissioning of infield and export flowlines and risers


Sub-contractors:

Ocean Installer: Contract for an umbilical installation project with Oceaneering for LLOG on the Delta House project. The scope of work includes umbilical transpooling, pre-lay survey, installation of umbilical with dynamic and static sections and umbilical pull-in to the semisubmersible. Normand Vision will use the 1800te carousel on the back deck of the vessel to install the umbilical for the Son of Bluto 2 discovery in approximately 2000m water depth. The offshore installation will start approximately on January 15, 2015. The project management and engineering is located in Ocean Installer’s Houston Office.
联系方式