Oil&Gas
Mustang Island Asset
2017-12-21 15:00  点击:1
VIP:1级

Project Profile



Value: Undisclosed
Location: Kleberg County, Gulf of Mexico
Capacity: 20 mmscfpd

The current I-1 Well, in which Silvermere has a 16.65 per cent working interest, re-entered an old drill hole in spring 2011, has tested satisfactorily and is expected to start production by the end of 2011. The production platform is currently being modified so that the facility can be installed and the tie-in process completed. This production platform has been designed with a capacity of 20 mmscfpd and should therefore be capable of supporting both the I-1 Well and the next two or three that follow.

Operators:

Dominion Production Company: Operator with 83.35% interest

Silvermere Energy: 16.65% interest

Contractor:

Laredo Construction: EPC contract
联系方式