Oil&Gas
Borogop & Doseo Blocks
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Location: Central Chad, Africa
Production: 2,200 barrels per (one well)
Area: 22,414 km2

The Borogop and Doseo blocks cover approximately 22,414 km2, the largest PSC by area held by Griffiths Energy. The company continues to conduct sub-surface and surface development and infrastructure feasibility studies to determine the optimum commercial development of the four discovery fields. The studies began in the fourth quarter of 2011 and are scheduled for completion in the second quarter of 2013. The E sands alone have 88.4m of net oil pay identified from logs, of which 75m were perforated by the previous Operator, resulting in oil test rates up to 2,200 barrels per day of 33-34° API oil. Based on these results, Griffiths Energy is planning to develop this field and believes that the recoverable volumes will be of sufficient quantity to anchor the major pipeline required to bring this field on production. This same pipeline will also provide the infrastructure necessary to develop discoveries made from the extensive exploration inventory of prospects in the Doseo/Borogop concession. On August 10, 2011, Griffiths Energy International Inc. executed the DOH PSC with the State. The DOH PSC provides the company with the exclusive right to explore and develop oil and gas reserves and resources in the DOH block an area of approximately 826 square kilometres.


Operators:

Griffiths Energy International Inc.: Operator with 100% interest
联系方式