Project Profile
Location: In the south of Block 6, 35 km north of Budour North East fields
Discovery: November 2014
Reserves: 930 bcf (26 bcm) of gas and 117 million barrels of condensate
Capacity: 35 mcf (991,000 cubic metres) per day of gas
Value: US$2-4 billion
Operator: PDO
Start-up: First Phase 2017
First well (TY-1) flowed at 46 mcf (1.3 mcm) per day of gas and 5,660 bpd of condensate during testing.
Gas and oil will be exported via the South Oman Gas Line and the Main Oil Line respectively
Operator:
PDO