CLOV Development Project - Deepwater Block 17
2020-08-12 09:42  点击:4
VIP:1级

Project Profile


Value: US$4,000 million
Location: Off the coast of Angola
Start-up Year: 2014
Water Depth: 1,400 m
Upstream Oil Reserves: 500 million bbl
Upstream Daily Oil Production: 160,000 bbl/day

The field development will use a standalone FPSO. The FPSO will be 305 metres long by 61 metres wide and will have the capacity to process around 160,000 b/d of oil and 6.5 million cubic metres of gas. It will have a storage capacity of 1.8 million barrels. The project will have 30 wells and is expected to produce reserves of approximately 500 million barrels of oil.

Package 1: Risers and production lines as well as a gas export line.
Package 2: Umbilical package which includes an option for supply of a mooring system, offloading line and buoy.


Operators:

Total E&P Angola: Operator with 40% interest

Statoil ASA: 23.33% interest

Esso Exploration and Production Angola: 20% interest

BP Angola: 16.67% interest


Contractors:

Acergy France S.A.: Subsea contractor

Aker Solutions ASA: Subsea umbilical

DOF Subsea: Geotechnical survey

FMC Technologies: Subsea production equipment

Framo Engineering AS: Subsea pumping system

Joint venture for FPSO EPC:

Daewoo Shipbuilding & Marine (DSME)
KBR

Vallourec: Equip 34 of Total\'s subsea wells with OCTG products with VAM premium connections

Intertek: Provision of testing, inspection, and measuring services to support the development and production of the new CLOV (Cravo, Lirio, Orquidea and Violeta fields) floating production storage and offloading (FPSO) terminal, off Angola.

Technip: Technip Angola Engenharia Limitada, a joint venture between Technip and Sonangol, was awarded by Total E&P Angola a three-year engineering services contract. This contract covers services for the existing Girassol, Pazflor, Dalia and CLOV floating production storage and offloading (FPSO) units and associated subsea field development. The scope of work can comprise engineering, technical assistance, management, supervision and coordination, as well as procurement-related activities. Technip Angola Engenharia Limitada will carry out the contract, which is scheduled for completion at the end of 2018. (March 2016)


Sub Contractors:

BMT Scientific Marine Services (USA): Riser monitoring systems for two Hybrid Riser Towers (HRT) and one Single Hybrid Riser (SHR) for Subsea 7 (Acergy)

Converteam SAS: Two drives and electric motors for the water injection pumps for FPSO

Fairstar Heavy Transport NV (FAIR): Transport FPSO components for DSME

GE Oil & Gas: Five complete Variable Speed Drive Systems including induction motors for FPSO

Pressure Tech: 100 units of the economical LF-540 hydraulic regulator for unknown supplier of actuator control systems

Technip (Angoflex): Production and water injection umbilicals