Project Profile
Value: US$45 million
Location: From Yas Island to Mina Zayed Port Pipeline
Start-up Year: 2015
Length: 45 km
The pipeline is 24-inch, 45-kilometre pipeline, which will supply gas to the existing natural gas vehicle filling station at the port by 2015.
Operator:
Gasco Joint Venture: Operator with 100% interest
Abu Dhabi National Oil Company (Adnoc)
UK/Dutch Shell Group
Total
Partex
Contractors:
Veco Engineering: FEED contract
Petrojet: EPC, Pre-commissioning, Commissioning & Test-Run