Project Profile
Location: North-eastern frontier of the field, Iran
Capacity: 20 million cubic feet of natural gas per day
Estimated production: 75 MMscm/d of treated gas
Start-up Year: May 2013
Phases 22, 23 and 24 were awarded to Khatam al-Anbia, Petro Sina Arian and SADRA and are located in the northeastern frontier of the field. The aim of phases 22, 23 and 24 development is to produce 42.5 million cubic metres (1.50 billion cubic feet) per day of natural gas, 57,000 barrels per day (9,100 m3/d) of natural gas condensate, and 300 tons of sulfur per day. The three phases also are designed to produce 800,000 tons of LNG and 750,000 tons of ethane per year. The scope of work for the upstream portion of these phases includes the construction and installation of three wellhead platforms equipped with a FWKD, test separator, utilities, access bridges and flare platform, as well as the drilling of 29 production wells and the installation of one 42-inch-diameter subsea pipeline.
The scope of work for the upstream portion of these phases includes the construction and installation of three wellhead platforms equipped with a FWKD, test separator, utilities, access bridges and flare platform, as well as the drilling of 29 production wells and the installation of one 42 inch-diameter subsea pipeline. Expected to produce 75 MMscm/d of treated gas, Phases 22, 23 and 24 concludes the planned field development on South Pars.
Operators:
Khatam al-Anbia (GHORB)
Petrosina Aria
Sadra
Pars Oil and Gas Company (POGC)
Contractors:
Payandan: EPC contract