Project Profile
Value: US$900 million
Location: Diyala Governate, around 100 km northeast of Baghdad
Start-up Year: 2017
Upstream Gas Reserves: 4,500 billion ft³
The project will see the development of the Mansuriyah Gas Field located in Diyala Governate, around 100 km north-east of Baghdad. The field has an estimated 4.5 trillion cubic feet (tcf) of gas and can produce approximately 300MMscf/day.
The development will include a gas processing facility will be able to produce 110 million cubic feet per day (cf/d) and will include a gas gathering station, gas and condensate separation units, a sweetening and regeneration unit and dehydration and regeneration unit.
Mansuriya participating interests are: TPAO (operator –37.5%), Oil Exploration Company (25%), Kuwait Energy (22.5%) and Korea Gas Corporation (15%).
Operators:
Turkiye Petrolleri AO (TPAO): Operator with 37.5% interest
Iraqi Oil Exploration Company (OEC): 25% interest
Korea Gas Corp.: 15% interest
Kuwait Energy Co.: 22.5% interest
Contractors:
BGR Energy Systems Limited: Engineering, procurement and supply contract
KBR: FEED contract
Mott MacDonald: Detailed design, engineereing and procurement contract